Renovations in the sewing room.

This is how it looked before we moved in. We decided to ripe down the ceiling (acoustical tiles), and put up real drywall.

After the drywall was done, we primed everything and sprayed the ceiling, and painted the walls.
We then decided to ripe out the carpet, and the lino that was under that, to install a laminate floor.

We got some organization into the closet, for all those sewing supplies.
We finished off by putting up the crown moldings and getting some cabinets for all the sewing stuff.